Railway Cable Drum Stand
The Railway Cable Drum Stand is designed to support cable drums weighing 6–10 tons during railway cable installation and maintenance.
- Product Introduction
The Railway Cable Drum Stand is designed to support cable drums weighing 6–10 tons during railway cable installation and maintenance. It is intended for railway construction contractors, infrastructure maintenance companies, railway equipment distributors and OEM equipment suppliers.
Technical Specifications
|
Parameter |
Specification |
|
Product Name |
Railway Cable Drum Stand |
|
Cable Drum Capacity |
6–10 tons |
|
Applicable Track Gauge |
1435 mm |
|
Stand Weight |
740 kg |
|
Overall Dimensions |
2180 × 2530 × 1951 mm |
|
Crossbar Diameter |
Φ102 mm |
|
Rail Mobility |
Equipped with wheels |
|
Ground Use |
Can be used without wheels |
|
Flatcar Transportation |
Secured with 4 bolts |
Key Features and Operating Configurations
Three Operating Configurations
Rail-Mounted Operation
The stand is equipped with wheels and can be pulled by a tractor car along 1435 mm gauge railway tracks. This configuration supports the movement of cable drums between railway work locations.
Ground-Based Operation
The wheels can be removed when the stand is used on the ground. This allows the equipment to serve as a cable drum support at trackside work areas where rail movement is not required.
Flatcar Transportation
For transportation by railway flatcar, the stand can be secured using four bolts. This arrangement supports the transfer of the equipment between railway construction and maintenance locations.
Cable Drum Support and Operating Safety
The stand is designed for cable drums weighing 6–10 tons and features a Φ102 mm crossbar for drum support. During rail-mounted operation, the wheels must be placed in wheel stops to prevent unintended movement.
Industrial Applications
The Railway Cable Drum Stand supports cable drums used in railway construction, cable installation and infrastructure maintenance.
Railway Signaling and Communication Cable Installation
During signaling and communication projects, the stand supports cable drums used for laying communication and signaling cables along railway lines. Its rail-mounted configuration allows the equipment to be moved between trackside work sections.
Railway Power and Trackside Electrical Installation
For railway power supply and trackside electrical projects, the stand provides support for cable drums at designated installation locations. It can be used where heavy electrical cables need to be handled along railway corridors.
New Railway Line Construction
New railway lines require signaling, communication and electrical cable installation across multiple construction sections. The stand supports the cable drums required for these works and can be moved by rail or transported by flatcar between work areas.
Railway Cable Replacement and Renewal
During the replacement of existing signaling, communication or electrical cables, the stand supports replacement cable drums at trackside work locations. It provides a support arrangement for cable handling during maintenance and renewal projects.
Manufacturing Capability
Jinzhou Tiegong Railway Maintenance Machinery Co., Ltd. was established in 1992 and specializes in railway construction and maintenance machinery. With more than 30 years of industry experience, the company has developed a product range covering more than 100 types of railway equipment under the Liaojin Tiegong brand.
The company has a technical team of nearly 20 professionals and has supplied railway equipment for overseas projects in countries including the Philippines, Mongolia, Indonesia, Mozambique, Ethiopia and Kenya. Its experience in railway machinery manufacturing provides the industrial background for supplying equipment used in railway construction and maintenance.
Quality Assurance
Product quality requirements should be assessed against the confirmed technical specifications and agreed order requirements.
For the Railway Cable Drum Stand, important acceptance points include:
- Structural Dimensions: Verification of the overall dimensions and relevant structural measurements.
- Crossbar and Support Structure: Checking the specified crossbar diameter and cable drum support structure.
- Wheel Configuration: Checking the wheel-equipped arrangement for the specified 1435 mm track gauge.
- Transportation Fixing: Verifying the four-bolt fixing arrangement for flatcar transportation.
Inspection records and specific inspection procedures should be provided or described only where they are available and confirmed by the manufacturer. Any applicable quality management certification should also be supported by a current certificate.
OEM Supply and Replacement Matching
Tiegong works with railway equipment distributors, OEM buyers, equipment integrators and purchasers seeking replacement equipment. Technical discussions can be based on the product specifications, drawings and operating requirements of each project.
Railway Equipment Distributors
Distributors can include the Railway Cable Drum Stand in their railway construction and maintenance equipment portfolios. Supply discussions can cover product specifications, order quantities, repeat purchases and available technical documentation.
OEM Buyers and Equipment Integrators
For equipment sourcing and integration projects, relevant technical information includes cable drum capacity and dimensions, frame dimensions, crossbar size, wheel configuration, track gauge and transportation arrangements. Requests for structural changes or alternative configurations need to be evaluated before they can be accepted.
Replacement Equipment Supply
For replacement requirements, buyers can provide existing equipment drawings, photographs and key dimensions for comparison. Assessment can cover cable drum capacity, overall dimensions, crossbar size, wheel configuration, track gauge and flatcar fixing arrangements. This helps determine whether the product is dimensionally and functionally suitable for the intended replacement, rather than assuming universal interchangeability.
Project Support
Tiegong can coordinate technical and procurement discussions for railway equipment orders, including:
- Technical Information: Providing available product specifications, dimensional drawings and relevant technical details.
- Project Requirement Review: Comparing confirmed product parameters with the technical requirements supplied by the buyer.
- Order Coordination: Discussing quantities, agreed configurations, production schedules, packaging and transportation arrangements.
- Overseas Supply: Coordinating export orders and international delivery arrangements for railway construction and maintenance equipment.
Frequently Asked Questions
Q: What is the load capacity?
A: The stand supports cable drums weighing 6–10 tons.
Q: What track gauge does it fit?
A: It is designed for 1435 mm gauge tracks.
Q: Can it be used on the ground?
A: Yes. Remove the wheels for ground-based use.
Q: How is it secured to a flatcar?
A: It is fixed with four bolts.
Q: Are wheel stops required?
A: Yes. Position the wheels in wheel stops during rail operation to prevent unintended movement.
Q: What information is needed for replacement matching?
A: Provide existing equipment drawings or photos, cable drum dimensions and capacity, track gauge, and mounting details for compatibility assessment.
Hot Tags: railway cable drum stand, China railway cable drum stand manufacturers, suppliers, 500kg insulated alloy Rail Trolley By Manual, rail car series, Rail Vehicle, Railway Car, Track Car, Track Replacement Vehicle
You Might Also Like




